Ledyard Middle School, Ledyard, CT

scroll down for details

38,994 sf Additions and 51,710 sf of Renovations
$35 Million
Completed: 2019

  • The new 6th to 8th grade MS will be hierarchical from 6th grade on 1st floor rising to the 8th grade on 3rd floor with new educational science classrooms
  • New classroom wings will be supported by a new auditorium, music, choral, art classrooms as well as “maker”/shop and technology classroom adjacent the new media center, new cafeteria, and kitchen
  • Gym will be renovated with all new lockers rooms
  • An emergency generator will permit the Town to use the school as an emergency shelter
  • All new electric, new heating, ventilation, and air conditioning through the school;  low voltage systems throughout
  • New technology infrastructure to support education