38,994 sf Additions and 51,710 sf of Renovations
$35 Million
Completed: 2019

  • The new 6th to 8th grade MS is hierarchical from 6th grade on 1st floor rising to the 8th grade on 3rd floor with new educational science classrooms

  • New classroom wings are supported by a new auditorium, music, choral, art classrooms as well as “maker”/shop and technology classroom adjacent the new media center, new cafeteria, and kitchen

  • Gym was renovated with all new lockers rooms

  • An emergency generator permits the Town to use the school as an emergency shelter

  • All new electric, new heating, ventilation, and air conditioning through the school; low voltage systems throughout

  • New technology infrastructure to support education