Gallup Hill School, Ledyard, CT

scroll down for details

39,591 SF Addition and 40,497 SF of Renovations
$28 Million
Completed: 2018

  • The addition creates a new bus loop and separate parent’s vehicular traffic pattern, including a Pre-K parent drop off on the existing 14.6-acre site

  • The renovated school and the school addition “re-stacks” the grades to allow for a Prek to 1st grade wing and all new classrooms through the 5th grade, supported by new music art, media center with new cafeteria and kitchen

  • Gymnasium was renovated to allow for physical education and assembly with stage/platform

  • All new electric, new heating, ventilation, and air conditioning throughout the school

  • New technology infrastructure to support education, and low voltage systems throughout in a challenging 1950s school building